Manpower Supply for PSDM PT.MCCI ( 2022 )
Overhoul PSDM Compressor PT.MCCI ( 2016 – 2022 ) Overhaul Compressor Train PT. AIR LIQUIDE ( 2021 ) MOTOR Replacement PT. LINDE INDONESIA ( 2019 ) Gearbox MAC A Oxigen PT. LINDE INDONESIA ( 2016 )
Remove and Install Gear Box Turbin ( 2022 ) Gearbox & Motor Installation Water Threatment ( 2022 ) OH gearbox MAC A Oxigen Plant ( 2016 – 2021 ) Manpower tools and consumable MAC A Oxigen Plant ( 2016 – 2021 ) Additional local man power MAC B Oxigen Plant ( 2016 – 2021 ) OH gearbox MAC B 2020 Oxigen Plant ( 2016 – 2021 ) Shut Down Oxigen Plant ( 2016 – 2021 ) Intercooler Replacement ( 2021 ) Rotor replacement MAC A Oxigen Plant ( 2021 ) B1C Inspection ( 2021 ) Piping Work for Air Separation Unit Gas Pipe Oxigen Plant ( 2012 )
WWTP Lining Tank Project ( 2021 )
Pengadaan Material Alam ( 2021 )
Pekerjaan Pagar Kawat Duri Sebelah Timur area PCM ( Pig Iron Casting Machine ) PT. Krakatau Posco ( 2021 ) Pembuatan Jendela Untuk Sirkulasi udara di GF HQ dan Auditorium ( Program Pencegahan Covid-19 ) ( 2021 )
Civil Work Storage Yard Km 11 ( 2019 ) Fabrikasi Spreader Beam ( 2019 ) Service, Supply, Maintenance & Construction Cilegon PT. IPC ( 2018 ) Recondition PK2 Canopy Ciwandan ( 2018 ) Renovasi Mess Karyawan Merak ( 2018 ) Service, Supply, Maintenance & Construction Cilegon PT. IKPP ( 2016 – 2017 )
Fabrikasi & Pemasangan Shelter ( 2019 ) Erection Steel Structure Air Compressor Station Blast furnace Area PT. Krakatau Steel ( 2014 )
Fabrikasi & Erection WH 03 ( 2019 ) Fabrikasi & Erection WH 02 ( 2018 ) Fabrikasi & Erection WH 01 ( 2017 )
Replacing Ceiling BPPI Plant – Merak ( 2017 ) Man Power TAR BPPI Plant – Merak ( 2016 )
Fabrikasi Pipa Dia 3800mm x 100 m PLTU Salira ( 2017 )
Pekerjaan Interior dan Design Pelabuhan Penyebrangan Bakauheni ( 2017 )
Pekerjaan Interior dan Design Container Kantin & Partisi Ruang Meeting ( 2015 ) Fabrikasi & Pemasangan Canopy Loby CPC Plant Bojonegara ( 2015 )
Pekerjaan Fabrikasi & pemasangan Warehouse Bagging & Storage Ciwandan PT. ASAHIMAS CHEMICAL INDONESIA (2017 ) Pekerjaan Fabrikasi & pemasangan BSSD Sliding Door Ciwandan PT. ASAHIMAS CHEMICAL INDONESIA ( 2017 ) Pekerjaan Fabrikasi & pemasangan Pagar & Gerbang ALINDO Ciwandan PT. ASAHIMAS CHEMICAL INDONESIA ( 2016 ) Pekerjaan Fabrikasi & pemasangan Sarin2 Back Up Phase Iv ( Gate & Fence ) Ciwandan PT. ASAHIMAS CHEMICAL INDONESIA ( 2016 )
Fabrikasi & Erection for WH1 ( Expansion ) Cilegon ( 2017 ) Concrete Floor for Oversindo Warehouse Cilegon ( 2017 ) Fabrikasi & Erection for WH1 Cilegon ( 2016 )
Maintenance Receiving Tower KGH Cilegon ( 2017 ) Repair Receiving Tower KGH Cilegon ( 2016 )
Manpower, Tooling & Consumable Supply for PSDM TPA-1 MCCI 2015 Cilegon PT. MCCI ( 2015 )
( 2015 )
Measurement For False Oven And Main Collecting Main In Batery #1 And #2 Coke - Pusher Plant PT. KRAKATAU POSCO ( 2014 ) Remeasurement For False Oven And Main Collecting Main In Batery #1 And #2 Coke - Pusher Plant PT. KRAKATAU POSCO ( 2014 ) Gtp Btx Recovery Tank Measurement Coke - Pusher Plant After Accident PT. KRAKATAU POSCO ( 2015 ) Gtp Btx Recovery Tank ReMeasurement Coke - Pusher Plant PT. KRAKATAU POSCO ( 2015 )
Plate Wall Cover For Coal Storage Steel Making Plant PT. KRAKATAU POSCO (2014) Pengadaan Material Alam ( 2014 ) Pekerjaan Sipil dan Perbaikan Pondasi Coal Receiving Storage Steel Making Plant PT. KRAKATAU POSCO ( 2014 )
Fabrication Genset House Project ( 2014 )
Dust Collector Blast Furnace PT. KRAKATAU POSCO ( 2013 )
Fabrikasi Coal Hopper 24 Unit Steel Making Plant PT. KRAKATAU POSCO ( 2013 )
Hydrant Pipe For Blast furnace Area ( Top Section) PT. Krakatau Posco ( 2012 ) Hydrant Pipe For Blast furnace Area ( Bottom Section ) PT. Krakatau Posco ( 2012 )
Fabrikasi & Erection Shelter Pool Truck A2 PT. Krakatau Bandar Samudera ( 2011 ) Perbaikan Rubber Fender PT. Krakatau Bandar Samudera ( 2010 ) Fabrikasi & Erection Jembatan u/ Tower 5 PT. Krakatau Bandar Samudera ( 2010 )
Jl. Sunan Drajat, RT/RW: 001/004, Pintu Air, Ciwandan, Kubangsari, Kec. Ciwandan, Kota Cilegon, Banten 42445
+62 254 7835006link@link-idn.com